Medium Voltage Electrical Penetrations

for containment buildings of nuclear power plants

The Medium Voltage (M.V.) Power Electrical Penetrations are assembled in canisters with power conductor modules for 1 kV to 15 kV circuits.

Terminal boxes are bolted on the canister to protect the connecting modes and allow the site cables entry at the bottom.

Medium Voltage Electrical Penetrations

 


Medium Voltage Electrical Penetrations
Medium Voltage Electrical Penetrations
The Medium Voltage (M.V.) Power Electrical Penetrations are assembled in canisters with power conductor modules for 1 kV to 15 kV circuits. Terminal boxes are bolted on the canister to protect the connecting modes and allow the site (...)

Découvrir

Low Voltage Electrical Penetrations
Low Voltage Electrical Penetrations
The Low Voltage (L.V.) Power Electrical Penetrations are assembled in canisters with conductor modules for 230 V to 1000V AC circuits. L.V. Power conductor modules are terminated with spade terminals, lugs or terminal blocks. (...)

Découvrir

I & C Electrical Penetrations
I & C Electrical Penetrations
The I & C Electrical Penetrations are assembled in canisters with conductor modules for 230 V to 440 V AC control circuits and DC circuits for Instrumentation. The I & C conductor modules are terminated with "connecting (...)

Découvrir

NEED AN ADVICE?
00
Electrical Penetrations installed in 150 nuclear power plants in the world
00
made conductive modules
00
cabinets installed in 30 nuclear power plants worldwide
00
Alarm cards made